Canonical: https://weaveos.com/glossary/throughput-forecast

[Home](https://weaveos.com/)/[Glossary](https://weaveos.com/glossary)/[Flow and capacity planning](https://weaveos.com/glossary/category/flow-capacity-planning)/Throughput forecast

[Flow and capacity planning](https://weaveos.com/glossary/category/flow-capacity-planning)

# Throughput forecast

Also known as Throughput forecast planning

By WeavePublished September 10, 20262 min read

## Definition

Throughput forecast is a concept used in software delivery planning to describe a condition, relationship, estimate, or decision about engineering work.

On this page

1. [Definition](https://weaveos.com/glossary/throughput-forecast#definition)
2. [What Throughput forecast means](https://weaveos.com/glossary/throughput-forecast#article-what-throughput-forecast-means)
3. [A concrete example](https://weaveos.com/glossary/throughput-forecast#article-a-concrete-example)
4. [Limits and interpretation](https://weaveos.com/glossary/throughput-forecast#article-limits-and-interpretation)
5. [How Weave fits](https://weaveos.com/glossary/throughput-forecast#article-how-weave-fits)
6. [How this relates to Weave](https://weaveos.com/glossary/throughput-forecast#weave)
7. [Sources](https://weaveos.com/glossary/throughput-forecast#sources)
8. [Related terms](https://weaveos.com/glossary/throughput-forecast#related)

## What Throughput forecast means

Throughput forecast is a concept used in software delivery planning to describe a condition, relationship, estimate, or decision about engineering work. Teams should preserve the original assumptions so later outcomes can be understood without rewriting the plan. The term is clearer when the team defines what enters the measure or decision, what counts as completion, and which planning period is in scope. That discipline prevents a familiar phrase from becoming a different metric in every meeting.

## A concrete example

For example, a roadmap discussion can show a likely range, the dependency that widens it, and the scope that can move if the assumption fails. The record should include the starting condition, the intended result, and the tradeoff that makes the choice possible. When the outcome differs from the plan, the team can inspect the assumption instead of assigning a simplistic explanation to the people doing the work.

## Limits and interpretation

A diagram, ratio, or status value does not replace local knowledge from the people who own the work and its outcome. Use this concept as an input to a decision or learning loop, not as a detached score. Keep the relevant work population visible, and revisit the interpretation when the system changes. A useful planning artifact explains what someone should do next and what evidence would change that action.

## How Weave fits

Weave can help teams inspect delivery evidence related to throughput forecast, including completed work, waiting, review, and rework patterns when those records are connected. That context can inform a planning discussion, but Weave does not make the decision, infer missing organizational context, or guarantee a date, capacity level, or outcome.

## How this relates to Weave

Weave can help teams inspect delivery evidence related to throughput forecast, including completed work, waiting, review, and rework patterns when those records are connected. That context can inform a planning discussion, but Weave does not make the decision, infer missing organizational context, or guarantee a date, capacity level, or outcome.

[Explore Engineering intelligence](https://weaveos.com/products/engineering-intelligence)

## Sources and further reading

1. [The Kanban Guide](https://kanbanguides.org/open-guide-to-kanban/2025.7/)

## Related terms

### [Cycle time](https://weaveos.com/glossary/cycle-time)

[What cycle time measures in software delivery, how workflow boundaries affect the result, and how to investigate long-running work.](https://weaveos.com/glossary/cycle-time)

### [Flow distribution](https://weaveos.com/glossary/flow-distribution)

[What flow distribution shows about software delivery times, why averages hide queues, and how teams can use percentiles to investigate variation.](https://weaveos.com/glossary/flow-distribution)

### [Queue time](https://weaveos.com/glossary/queue-time)

[What queue time means in engineering workflows and how waiting affects delivery speed.](https://weaveos.com/glossary/queue-time)
