# Percentile forecast

Also known as Percentile forecast planning

By WeavePublished September 10, 20262 min read

## Definition

Percentile forecast is a concept used in software delivery planning to describe a condition, relationship, estimate, or decision about engineering work.

On this page

1. [Definition](https://weaveos.com/glossary/percentile-forecast#definition)
2. [What Percentile forecast means](https://weaveos.com/glossary/percentile-forecast#article-what-percentile-forecast-means)
3. [A concrete example](https://weaveos.com/glossary/percentile-forecast#article-a-concrete-example)
4. [Limits and interpretation](https://weaveos.com/glossary/percentile-forecast#article-limits-and-interpretation)
5. [How Weave fits](https://weaveos.com/glossary/percentile-forecast#article-how-weave-fits)
6. [How this relates to Weave](https://weaveos.com/glossary/percentile-forecast#weave)
7. [Sources](https://weaveos.com/glossary/percentile-forecast#sources)
8. [Related terms](https://weaveos.com/glossary/percentile-forecast#related)

## What Percentile forecast means

Percentile forecast is a concept used in software delivery planning to describe a condition, relationship, estimate, or decision about engineering work. It is most useful when the team names its unit, time window, owner, and decision boundary. The term is clearer when the team defines what enters the measure or decision, what counts as completion, and which planning period is in scope. That discipline prevents a familiar phrase from becoming a different metric in every meeting.

## A concrete example

For example, a team might compare a normal period with a support-heavy period before changing its capacity or sequencing policy. The record should include the starting condition, the intended result, and the tradeoff that makes the choice possible. When the outcome differs from the plan, the team can inspect the assumption instead of assigning a simplistic explanation to the people doing the work.

## Limits and interpretation

A single observation is weak evidence. Look for repeated patterns and record changes in staffing, demand, workflow, and dependencies. Use this concept as an input to a decision or learning loop, not as a detached score. Keep the relevant work population visible, and revisit the interpretation when the system changes. A useful planning artifact explains what someone should do next and what evidence would change that action.

## How Weave fits

Weave can help teams inspect delivery evidence related to percentile forecast, including completed work, waiting, review, and rework patterns when those records are connected. That context can inform a planning discussion, but Weave does not make the decision, infer missing organizational context, or guarantee a date, capacity level, or outcome.

## How this relates to Weave

Weave can help teams inspect delivery evidence related to percentile forecast, including completed work, waiting, review, and rework patterns when those records are connected. That context can inform a planning discussion, but Weave does not make the decision, infer missing organizational context, or guarantee a date, capacity level, or outcome.

[Explore Engineering intelligence](https://weaveos.com/products/engineering-intelligence)

## Sources and further reading

1. [The Kanban Guide](https://kanbanguides.org/open-guide-to-kanban/2025.7/)

## Related terms

### [Cycle time](https://weaveos.com/glossary/cycle-time)

[What cycle time measures in software delivery, how workflow boundaries affect the result, and how to investigate long-running work.](https://weaveos.com/glossary/cycle-time)

### [Flow distribution](https://weaveos.com/glossary/flow-distribution)

[What flow distribution shows about software delivery times, why averages hide queues, and how teams can use percentiles to investigate variation.](https://weaveos.com/glossary/flow-distribution)

### [Queue time](https://weaveos.com/glossary/queue-time)

[What queue time means in engineering workflows and how waiting affects delivery speed.](https://weaveos.com/glossary/queue-time)